> This is an example of side effect in Bangladesh
under Emergency Rule
>
> Power Situation Improves Significantly - Attitude
adjustment under CTG
>
> Load shedding drops to 200MW from 1200MW
>
> In addition to increased power production, revenue
collection by the PDB and
> Dhaka Electric Supply Authority (Desa) has also shot
up significantly.
>
> Sources said PDB's revenue collection has shot up to
Tk 5,000 crore in the
> calendar year, while its bill collection ratio has
shot up to 110 percent
> from its previous 80-85 percent.
>
> PDB's biggest single client Desa's payment to PDB
for purchase of power has
> exceeded Tk 100 crore a month.
>
> ===================================================
>
> Sharier Khan
>
> The Power Development Board (PDB) has made a
significant improvement in
> power supply in the last two months mainly by
improving day-to-day
> management where officials and technical experts are
encouraged to take
> independent decisions, sources said.
>
> Moreover, the government's successful implementation
of load management and
> staggering holidays at industrial zones, improvement
in gas supply to power
> plants, and high emphasis on bill collection also
have significant
> contributions in this regard. Now the margin of load
shedding has dropped
> from 1,200MW to a mere 100-200MW.
>
> The country experienced load shedding by a massive
margin of maximum 2,000MW
> a day last year.
>
> Against an official maximum demand of 4,240MW, the
PDB is now supplying more
> than 4,100MW of power from 100 different power units
of 27 power plants by
> improving plant efficiency.
>
> The same number of plants was providing the nation
with maximum 2,800MW of
> power last year.
>
> Since then, only one additional power unit of
70MW--the Mymensingh Power
> Plant--came into operation two months ago.
>
> Currently, 12 power units remain shut down for
maintenance work. If all
> these units start operation, the country's power
production could be as high
> as 4,600MW, which is more than the official demand.
>
> In addition to increased power production, revenue
collection by the PDB and
> Dhaka Electric Supply Authority (Desa) has also shot
up significantly.
>
> Sources said PDB's revenue collection has shot up to
Tk 5,000 crore in the
> calendar year, while its bill collection ratio has
shot up to 110 percent
> from its previous 80-85 percent.
>
> PDB's biggest single client Desa's payment to PDB
for purchase of power has
> exceeded Tk 100 crore a month.
>
> "Desa's bill collection ratio has also significantly
gone up. Fearing arrest
> by the joint forces, many large power consumers that
had deliberately
> defaulted on bills of hundreds of crores of taka are
now paying off their
> arrears," said an official.
>
> The PDB's overall systems loss has also improved by
2.5 percent in the last
> nine months. Whereas the systems loss was 17.5
percent in January, it
> quickly came down to 15 percent after the change of
government.
>
> "This alone has saved PDB power worth Tk 110 crore
in the last nine months,"
> the official added.
>
> "It doesn't mean PDB's problems are over. It means
that even within
> limitations, professionals can do a better job if
they are properly given
> the responsibility.
>
> "There can be a major power blackout or grid failure
and there is still load
> shedding. To ensure a safe power supply, we must
have at least 10 percent
> additional capacity above the demand as a reserve
margin."
>
> While the official power demand is shown at 4,250MW,
unofficially this
> demand stands at maximum 5,200MW. But this
additional demand is underplayed
=== Message Truncated ===


____________________________________________________________________________________
Got a little couch potato?
Check out fun summer activities for kids.
http://search.yahoo.com/search?fr=oni_on_mail&p=summer+activities+for+kids&cs=bz

<*> To visit our associated site, go to:

http://www.DeshiHost.com/

<*> To visit our associated e-news portal, go to:

http://www.loksangbad.com/


Yahoo! Groups Links

<*> To visit your group on the web, go to:

http://groups.yahoo.com/group/Noakhali/

<*> Your email settings:
Individual Email | Traditional

<*> To change settings online go to:

http://groups.yahoo.com/group/Noakhali/join

(Yahoo! ID required)

<*> To change settings via email:
mailto:Noakhali-digest@yahoogroups.com
mailto:Noakhali-fullfeatured@yahoogroups.com

<*> To unsubscribe from this group, send an email to:
Noakhali-unsubscribe@yahoogroups.com

<*> Your use of Yahoo! Groups is subject to:

http://docs.yahoo.com/info/terms/

[ Noakhali Online Group ] Call for Free Open Source Leadership e-Course in Bangladesh

This summary is not available. Please click here to view the post.

[greater_noakhali] Call for Free Open Source Leadership e-Course in Bangladesh

---------- Forwarded message ----------
From: mail_chd <mail_chd@yahoo.com>
Subject: [bangla_l10n] Call for Free Open Source Leadership e-Course in Bangladesh

Dear Sir,
Greeting from Center for Human Development (CHD). CHD is secretariat
of Youth Forum for ICT Development. To celebrate Software Freedom
Day, 07 and also to help young people better understand the Open
source process and take an active role in shaping it, Youth forum
for ICT Development (YFID) partnership with Bangladesh Open Source
Network (BdOSN) going to organize a youth-friendly free online
course titled Open source Leadership e course. From October 1st –
October 26th 2007 (4 weeks), Application dead line is 24th
September, 2007. The course will offer participants a venue to
discuss Open source.
If you are our target people or right person to inform other we
encourage you to participate or inform other through your network.
More information is available at www.chd.web1000.com

Any questions regarding this course feel free to contact me.

Thank you

Shoag Ahmed
Program officer
Center for Human Development
Email: mail_chd@yahoo.com
www.chd.web1000.com

__._,_.___

Ramadan Mubarak to all of you. Take the Ramadan as a holy sequence........ Rahmat, Barkat and Magfirat.

[Disclaimer: Any posting to this group is the opinion of the author himself. Authors of the messages to the Group are responsible for the accuracy of their information and the conformance of their material with applicable copyright and other laws. Many people will read your post, and it will be archived for a very long time. The act of posting indicates the subscriber's agreement to accept the adjudications of the moderator]




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___

[ Noakhali Online Group ] Bangladesh Power Situation Improves Significantly- Attitude adjustment under CTG

This is an example of side effect in Bangladesh under Emergency Rule Power Situation Improves Significantly - Attitude adjustment under CTG Load shedding drops to 200MW from 1200MW In addition to increased power production, revenue collection by the PDB and Dhaka Electric Supply Authority (Desa) has also shot up significantly. Sources said PDB's revenue collection has shot up to Tk 5,000 crore in the calendar year, while its bill collection ratio has shot up to 110 percent from its previous 80-85 percent. PDB's biggest single client Desa's payment to PDB for purchase of power has exceeded Tk 100 crore a month. =================================================== Sharier Khan The Power Development Board (PDB) has made a significant improvement in power supply in the last two months mainly by improving day-to-day management where officials and technical experts are encouraged to take independent decisions, sources said. Moreover, the government's successful implementation of load management and staggering holidays at industrial zones, improvement in gas supply to power plants, and high emphasis on bill collection also have significant contributions in this regard. Now the margin of load shedding has dropped from 1,200MW to a mere 100-200MW. The country experienced load shedding by a massive margin of maximum 2,000MW a day last year. Against an official maximum demand of 4,240MW, the PDB is now supplying more than 4,100MW of power from 100 different power units of 27 power plants by improving plant efficiency. The same number of plants was providing the nation with maximum 2,800MW of power last year. Since then, only one additional power unit of 70MW--the Mymensingh Power Plant--came into operation two months ago. Currently, 12 power units remain shut down for maintenance work. If all these units start operation, the country's power production could be as high as 4,600MW, which is more than the official demand. In addition to increased power production, revenue collection by the PDB and Dhaka Electric Supply Authority (Desa) has also shot up significantly. Sources said PDB's revenue collection has shot up to Tk 5,000 crore in the calendar year, while its bill collection ratio has shot up to 110 percent from its previous 80-85 percent. PDB's biggest single client Desa's payment to PDB for purchase of power has exceeded Tk 100 crore a month. "Desa's bill collection ratio has also significantly gone up. Fearing arrest by the joint forces, many large power consumers that had deliberately defaulted on bills of hundreds of crores of taka are now paying off their arrears," said an official. The PDB's overall systems loss has also improved by 2.5 percent in the last nine months. Whereas the systems loss was 17.5 percent in January, it quickly came down to 15 percent after the change of government. "This alone has saved PDB power worth Tk 110 crore in the last nine months," the official added. "It doesn't mean PDB's problems are over. It means that even within limitations, professionals can do a better job if they are properly given the responsibility. "There can be a major power blackout or grid failure and there is still load shedding. To ensure a safe power supply, we must have at least 10 percent additional capacity above the demand as a reserve margin." While the official power demand is shown at 4,250MW, unofficially this demand stands at maximum 5,200MW. But this additional demand is underplayed by not accommodating the full power demand of the Rural Electrification Board (REB) that doubled its distribution network during 2001-06 period. "These improvements have been possible because the PDB has become active in the last several months," said he. In recent years, the PDB became an organisation devoid of leadership and proper decisions. This was because the Prime Minister's Office (PMO) and the power ministry dictated many technical decisions and imposed many business decisions on the PDB. As a result, the PDB chiefs took no decision that could "offend" the powerful ones who were only interested to bag various power deals. Some of these powerful ones included Harris Chowdhury, the then political secretary to the PM. "The past PDB chairmen used to forward files to the ministry regarding a decision that he alone could take on a single day. There are records that PDB spent more than a month on a decision that could have been taken instantly," a source pointed out. Such indecisiveness also affected various gas sector bodies. Consequently, both power generation and gas supplies became acutely problematic. As gas is the main source of power generation, poor gas supply had caused many power plants to produce less power, while a number of power plants were generating less power because of technical difficulties. The power ministry now encourages the PDB to work independently. The power secretary has given a clear directive that technical decisions will be taken by technical people. Subsequently, the PDB chief motivates all technical hands to take decisions. Many decisions are even taken during phone conversations with technical hands. "He tells them that he would back them always. Now that's the assurance a leader should give to his subordinates. Earlier, this simple practice was a forgotten norm in the PDB," he noted. This encourages technicians to take professional decisions, which, in the recent past, came as orders from higher authorities. PDB records show that on Tuesday it produced 4,013MW and on Monday 4,130MW of power. Throughout August, PDB's power production hovered around 3,800MW. The PDB broke its 4,000MW barrier on September 15 for the first time in Bangladesh's history. "In the past decisions like load management were taken, but they were not implemented. This time, load management or staggering holidays in industrial zones were successfully implemented, thanks to the government's political will. After all, result of all good decisions depend on their proper implementation," observed an official. Source: http://www.thedailystar.net/story.php?nid=4977
__._,_.___
To visit our associated site, go to: http://www.DeshiHost.com/ To visit our associated e-news portal, go to: http://www.loksangbad.com/

[greater_noakhali] Bangladesh Power Situation Improves Significantly- Attitude adjustment under CTG

This is an example of side effect in Bangladesh under Emergency Rule

Power Situation Improves Significantly - Attitude adjustment under CTG

Load shedding drops to 200MW from 1200MW

In addition to increased power production, revenue collection by the PDB and Dhaka Electric Supply Authority (Desa) has also shot up significantly. Sources said PDB's revenue collection has shot up to Tk 5,000 crore in the calendar year, while its bill collection ratio has shot up to 110 percent from its previous 80-85 percent. PDB's biggest single client Desa's payment to PDB for purchase of power has exceeded Tk 100 crore a month.

===================================================

Sharier Khan
The Power Development Board (PDB) has made a significant improvement in power supply in the last two months mainly by improving day-to-day management where officials and technical experts are encouraged to take independent decisions, sources said. Moreover, the government's successful implementation of load management and staggering holidays at industrial zones, improvement in gas supply to power plants, and high emphasis on bill collection also have significant contributions in this regard. Now the margin of load shedding has dropped from 1,200MW to a mere 100-200MW.The country experienced load shedding by a massive margin of maximum 2,000MW a day last year.Against an official maximum demand of 4,240MW, the PDB is now supplying more than 4,100MW of power from 100 different power units of 27 power plants by improving plant efficiency. The same number of plants was providing the nation with maximum 2,800MW of power last year.Since then, only one additional power unit of 70MW--the Mymensingh Power Plant--came into operation two months ago. Currently, 12 power units remain shut down for maintenance work. If all these units start operation, the country's power production could be as high as 4,600MW, which is more than the official demand.In addition to increased power production, revenue collection by the PDB and Dhaka Electric Supply Authority (Desa) has also shot up significantly. Sources said PDB's revenue collection has shot up to Tk 5,000 crore in the calendar year, while its bill collection ratio has shot up to 110 percent from its previous 80-85 percent.PDB's biggest single client Desa's payment to PDB for purchase of power has exceeded Tk 100 crore a month. "Desa's bill collection ratio has also significantly gone up. Fearing arrest by the joint forces, many large power consumers that had deliberately defaulted on bills of hundreds of crores of taka are now paying off their arrears," said an official. The PDB's overall systems loss has also improved by 2.5 percent in the last nine months. Whereas the systems loss was 17.5 percent in January, it quickly came down to 15 percent after the change of government. "This alone has saved PDB power worth Tk 110 crore in the last nine months," the official added."It doesn't mean PDB's problems are over. It means that even within limitations, professionals can do a better job if they are properly given the responsibility. "There can be a major power blackout or grid failure and there is still load shedding. To ensure a safe power supply, we must have at least 10 percent additional capacity above the demand as a reserve margin." While the official power demand is shown at 4,250MW, unofficially this demand stands at maximum 5,200MW. But this additional demand is underplayed by not accommodating the full power demand of the Rural Electrification Board (REB) that doubled its distribution network during 2001-06 period. "These improvements have been possible because the PDB has become active in the last several months," said he.In recent years, the PDB became an organisation devoid of leadership and proper decisions. This was because the Prime Minister's Office (PMO) and the power ministry dictated many technical decisions and imposed many business decisions on the PDB. As a result, the PDB chiefs took no decision that could "offend" the powerful ones who were only interested to bag various power deals. Some of these powerful ones included Harris Chowdhury, the then political secretary to the PM. "The past PDB chairmen used to forward files to the ministry regarding a decision that he alone could take on a single day. There are records that PDB spent more than a month on a decision that could have been taken instantly," a source pointed out. Such indecisiveness also affected various gas sector bodies. Consequently, both power generation and gas supplies became acutely problematic. As gas is the main source of power generation, poor gas supply had caused many power plants to produce less power, while a number of power plants were generating less power because of technical difficulties. The power ministry now encourages the PDB to work independently. The power secretary has given a clear directive that technical decisions will be taken by technical people. Subsequently, the PDB chief motivates all technical hands to take decisions. Many decisions are even taken during phone conversations with technical hands. "He tells them that he would back them always. Now that's the assurance a leader should give to his subordinates. Earlier, this simple practice was a forgotten norm in the PDB," he noted. This encourages technicians to take professional decisions, which, in the recent past, came as orders from higher authorities. PDB records show that on Tuesday it produced 4,013MW and on Monday 4,130MW of power. Throughout August, PDB's power production hovered around 3,800MW.The PDB broke its 4,000MW barrier on September 15 for the first time in Bangladesh's history. "In the past decisions like load management were taken, but they were not implemented. This time, load management or staggering holidays in industrial zones were successfully implemented, thanks to the government's political will. After all, result of all good decisions depend on their proper implementation," observed an official. Source: http://www.thedailystar.net/story.php?nid=4977
__._,_.___
Messages in this topic (1) Reply (via web post) Start a new topic
Messages Files Photos Links Database Polls Calendar
Ramadan Mubarak to all of you. Take the Ramadan as a holy sequence........ Rahmat, Barkat and Magfirat.[Disclaimer: Any posting to this group is the opinion of the author himself. Authors of the messages to the Group are responsible for the accuracy of their information and the conformance of their material with applicable copyright and other laws. Many people will read your post, and it will be archived for a very long time. The act of posting indicates the subscriber's agreement to accept the adjudications of the moderator]